Micra
#1.0 DropDownMenu1


 

 

Modular solutions - commercial


Commercial Office/Apartments
 

Bespoke Design
 
Area: East London
Size: 590 m/2 or 6,393 ft/2
Storey:
Type: 15 Modular Units which consisted of  I x 3 Bedroom Apartment, 2 Studio Offices,3 x 2 Bedroom Maisonettes
Framework: Treated Carbon Steel
Floors: Lytag Concrete, Oak
External Finish: Slip Brick &  
Window & Doors: Oak & Aluminium Covered Siberian Redwood
Internal Finish: Prefabricated insulated panels 
Roof Finish: Alkor Draka roofing membrane
Part Heating: Combi Boilers
Factory Build: 12 Weeks
Site Installation: 3 Day
Site Works: 5 weeks

Commercial Office/Disabled Toilets
 

Area: Swindon
Size: 4 m/2 or 43 ft/2
Storey:
Type: 18 Modular Disabled Toilets 
Framework: Treated Carbon Steel
Floors: Vinyl
External Finish: Tough-check Plasterboard  
Internal Finish: Prefabricated insulated panels 
Roof Finish: Tough-check Plasterboard  
Factory Build: 3 Weeks
Site Installation: 1 Day
Site Works: 1 weeks

 

   

Return to modular solutions menu

 

 
Bookmark us Terms of use Privacy policy Contact us
 Copyright © 2009 DriBuildLtd. - all rights reserved.